IMG-20180629-WA0001IMG-20180629-WA0003IMG-20180629-WA0002IMG-20180629-WA0004IMG-20180629-WA0005IMG-20180629-WA0006IMG-20180629-WA0007IMG-20180629-WA0008IMG-20180629-WA0009IMG-20180629-WA0010IMG-20180629-WA0011IMG-20180629-WA0012 Project status: Finished Date of project: Location of project: Dangote refinery ibeju lekki, lagos Nigeria Period:
Finished industrial fire exit steel doors installed for Vita Construction LTD at different sites and commissioned Project / September 24, 2020 Project status: Finished
Finished hot pressed grp/frp water storage tank on plinth for NNDC Olugbobri, Silga, Bayelsa state Project / September 24, 2020 Project status: Finished Date of project: Location of project: Olugbobri, silga, bayelsa state Period: