Bullet Resistance Acc. Door Access Control Door Anti Blast Security door Panic Fire Exit Door Fault Security Steel Door Polyester powder coated steel with 300X300 wired glass panel Project status: Finished
Erection of pre-fab buildings at Dangote Refinery Ibeju Lekki LFTZ finished FRP/GRP on elevated tower and commissioned for Maritime Academy of Nigeria Project / September 24, 2020 Project status: Finished Date of project: Location of project: Dangote refinery ibeju lekki, lagos Nigeria Period:
Finished hot pressed grp/frp water storage tank on plinth for NNDC Olugbobri, Silga, Bayelsa state Project / September 24, 2020 Project status: Finished Date of project: Location of project: Olugbobri, silga, bayelsa state Period: